TRAFFIC AND INFRASTRUCTURE PROJECTS
|
DINCO also has experience in executing traffic and infrastructure projects. In order to best serve these types of projects, Dinco invests and owns such kinds of machineries as: excavators, bulldozers, rollers, graders; dump truck for leveling works. Besides, Dinco also owns much other specialized equipment to serve specific works such as: dredging, dyke…
|
DINCO has executed many traffic and infrastructure projects: Da Phuoc International New Town Project ; Hoa Xuan Wastewater Treatment Plant Civil Works And Ancillary Facilities; Engineering Infrastructure of E Area - Residential Area at South of Cam Le Bridge; Engineering Infrastructure of E Extension Area (phase 3) - Residential Area at South of Cam Le Bridge ; Engineering Infrastructure of Residential Area at Northern West of Resettlement Zone No.6 along DT602 Route ; Infrastructure of Hoa Khanh Industrial Zone; Nam Hai van Tuy Loan Bypass, etc.. |
Son Tra Port Construction Project (phase 1)
Project title | Son Tra Port Construction Project (phase 1) |
Location | Yet Kieu street, Tho Quang Ward, Son Tra District, Da Nang City |
Owner | Son Tra Petroleum Service General Port JSC |
Completion time | 01/2014 - 06/2015 |
Contract sum | 112.288.702.000 VNĐ |
Work scope |
Son Tra Port Construction Project with the area of about 10 ha locates in the further side of Da Nang Gulf, at the distance of nearly 2 kilometers from Tien Sa port, Tho Quang Ward, Son Tra District, Da Nang city. Continuing with phase 1,2,3 which had been completed, With experiences from leveling for Daewon Cantavil project, DINCO was chosen to construct this project, including the following work items: backfill of 8,1 ha in area with the quantity of 400,000m3; construction of the traffic and drainage infrastructure system, electricity system and landscape. |
Da Phuoc International New Town Project (phase 1)
Project title | Da Phuoc International New Town Project (phase 1) |
Location | Thuan Phuoc Ward, Hai Chau District, Da Nang City |
Owner | Daewon Cantavil Co., Ltd |
Completion time | 5/2008 - 10/2010 |
Contract sum |
USD 9,046,452(phase 1) / USD 22,225,954 (phases 1&2) |
Work scope |
Da Phuoc International New Town Project, which is executed on the area of 210ha at the west of Thuan Phuoc Bridge in Hai Chau District, is the first encroached town in Da Nang City. Defeating many international Contractors, Dinco is awarded the Phase 1 of the project. Scope of work of this Package includes dredging and filling with total area of 88 ha and filling quantity of 3.000.000m3. |

Project title | Hoa Xuan Wastewater Treatment Plant Civil Works and Ancillary Facilities |
Location | Hoa Xuan Ward, Cam Le District, Danang City |
Owner | Project Management Unit of Danang Priority Infrastructure Investment Project |
Completion time | 5/2011 - 01/2014 |
Contract sum |
USD 7,226,932 |
Work scope |
This project is funded by World Bank, executed on an area of 22 ha at Hoa Xuan Ward, Cam Le, Danang City. DINCO carries out such items of work as: leveling of 22 ha with quantity of 740.000m3, builds traffic and infrastructure system, drainage system, office buildings, workshops, clo building, electricity system and landscape. |

Project title | Infrastructure of Hoa Khanh Industrial Zone |
Location | Hoa KhanhWard, Lien Chieu District, Danang City |
Owner | Danang Industrial Zone Infrastructure Development & Exploitation Company |
Completion time | 12/2004 - 12/2006 |
Contract sum |
USD 8,546,001 |
Work scope |
The Owner of Infrastructure of Hoa Khanh Industrial Zone Project is the People’s Committee of Danang City. DINCO executes all items of work of this project such as: leveling, builds traffic and infrastructure system, drainage system for Lot M, lot N, Thanh Vinh 3 Resettlement Zone, Hoa Hiep 1 Resettlement Zone, 12B-14B route, 6A-7B roads of the IZ. |

Project title | Engineering Infrastructure of E Extension Area (phase 3) |
Location | Hoa Xuan Ward, Cam Le District, Danang City |
Owner | Danang Construction Material - Housing, Construction & Trading One-Member Ltd., Co. |
Completion time | 9/2011-9/2012 |
Contract sum |
USD8,751,882 |
Work scope |
This project belongs to the People’s Committee of Danang City, locating at Hoa Xuan Ward, Cam Le District, Danang City. Thanks to the experience in leveling after executing the Da Phuoc International New Town Project, Dinco is selected as Contractor for this project. The scope of work includes: leveling on shore of 20,9 ha, adjusting the river to the new flow direction, 800,000m3 of leveling and build infrastructure for resettlement purposes. |
Engineering Infrastructure of E Area (phase 2) - Residential Area at South of Cam Le Bridge

Project title | Engineering Infrastructure of E Area (phase 2) |
Location | Hoa Xuan Ward, Cam Le District, Danang City |
Owner | Danang Housing Investment & Development Company |
Completion time | 5/2009-5/2010 |
Contract sum |
USD 2,967,950 |
Work scope |
This project belongs to the People’s Committee of Danang City, locating at Hoa Xuan Ward, Cam Le District, Danang City. DINCO carries out such items as: leveling, builds traffic and infrastructure system, drainage system for routes of residential areas E1,E2. |

Project title | Engineering Infrastructure of Residential Area at Northern West of Resettlement Zone No.6 along DT602 Route |
Location | Hoa Son Commune, Hoa Vang District, Danang City |
Owner | Danang Construction Material - Housing, Construction & Trading One-Member Ltd., Co. |
Completion time | 01/2012-3/2013 |
Contract sum |
USD 2,840,947 |
Work scope |
This project belongs to the People’s Committee of Danang City, locating at Hoa Son Commune, Hoa Vang District, Danang City. DINCO carries out such items as: leveling of 15ha with 350,000m3, and builds infrastructure system for resettlement purposes. |

Project title | Nam Hai Van - Tuy Loan Bypass |
Location | Hoa Vang District, Danang City |
Owner | The People’s Committee of Danang City |
Completion time | 12/2006-12/2007 |
Contract sum |
USD 5,605,730 |
Work scope |
This project belongs to the People’s Committee of Danang City, locating at Hoa Vang District, Danang City. Such items of work executed by Dinco as: road-bed and drainage system for the length of 18Km, Bm=12m. |

Project title | Binh Tu - Binh Trieu Bridge |
Location | Quang Nam Province |
Owner | Development Project Management Unit of Quang Nam Province |
Completion time | 01/2008-8/2008 |
Contract sum | 15,250,000,000 |
Work scope |
Binh Tu - Binh Trieu Bridge belongs to the route Ngọc Phô-Hưng Mỹ in Quang Nam province, this project is funded by OPEC. DINCO executes the following items: Reinforced concrete piles 35x35, L=14m, T Beam with span of 12m, length of bridge 42m. |

Project title | Road 6A-7B – Infrastructure of Hoa Khanh IZ |
Location | Hoa Khanh Ward, Lien Chieu District, Da Nang City |
Owner | Danang IZ Infrastructure Development & Exploitation Company |
Completion time | 12/2008 - 12/2009 |
Contract sum | 112,000,000,000 |
Work scope |
Hoa Khanh IZ is invested by People’s Committee of Danang City, locating at Hoa Khanh Ward, Danang City. DINCO executes the following items: road base, drainage system on the route with length of 7Km, Bm=10,5m. |

Project title | Mo Spring Bridge |
Location | Hoa Ninh Commune - Hoa Vang District Danang City |
Owner | Sun group |
Completion time | 05/2009-8/2010 |
Contract sum | 45,000,000,000 |
Work scope |
Mo Spring Bridge is on the way to Ba Na, Danang city, and invested by Sun Group. DINCO executes the following items: pre-stressed I beam 25m, length of bridge 75m |

Project title | Road 12B-14B - Infrastructure of Hoa Khanh IZ |
Location | Hoa Khanh Ward, Lien Chieu District, Danang City |
Owner | Sai Gon – Danang Investment JSC |
Completion time | 10/2006 - 05/2007 |
Contract sum | 80,000,000,000 |
Work scope |
Hoa Khanh IZ is invested by People’s Committee of Danang City, locating at Hoa Khanh Ward, Danang City. DINCO executes the following items: road base, drainage system on the route with length of 5Km, Bm=10,5m |

Project title | Infrastructure of Massda Land Residential Area |
Location | An Don IZ, Son Tra District, Danang City |
Owner | Massda Land Co. |
Completion time | 02/2008-10/2008 |
Contract sum | 38,500,000,000 |
Work scope |
Massda Land Residential Area is invested by Massda - Malaysia on an area of 12 ha. DINCO executes the following items: leveling, infrastructure of residential area, guard house. |