GENERAL CONTRACTOR OF INDUSTRIAL PLANTS

                 

DINCO’s specialty is general contracting of Industrial Plants.

DINCO makes strong investment in human resources, especially Project Managers, Site Managers and Site Engineers in order to provide Customers with quality projects and commit to comply with the tightest progress.            
                                 

We have experiences in general contracting for many industrial plants such as: Nissan Auto Assembly Plant, Garment Equipment Manufacture Factory, Radial Truck Tyre Manufacture Factory, Toothbrush Manufacturing Facility, Electronic Component Factory, Daiwa Vietnam Fishing Rod Factory , etc…


Tay An Spinning Mill

Project title Tay An Spinning Mill
Location Tay An Industrial Cluster, Duy Xuyen, Quang Nam
Owner RIO Vietnam Spinning Company, Ltd.
Construction Time 2015
Contract sum 3.469.970 USD
Work scope

Tay An Spinning Mill, which belongs to RIO Vietnam Spinning Company, Ltd. (Korea), is built on the land of 4,5 ha in area at Tay An Industrial Cluster, Duy Xuyen District, Quang Nam Province. This mill specializes in spinning used for textile industry...


Design items includes Workshop no 1&2 with the area of 23.000m2, Canteen of 450m2, Motorbike shed of 310m2, Pump station and under water tank, waste water treatment station, rainwater drainage system, internal road, landscape, fence, leveling ...
Dinco helped the Owner get all the licenses related to the construction.

 Onewoo Garment Factory


Project title Onewoo Garment Factory
Location Ha Lam – Cho Duoc Industrial Cluster, Thang Binh District, Quang Nam Province
Owner Onewoo Garment Company, Ltd.,
Completion time 15/4/2015 – 23/12/2015
Contract sum (VND) 41.067.731.766 VND
Work scope

Onewoo Garment Factory (Korea) is built on the land of 2,5 ha in area at ha Lam – Cho Duoc Industrial Cluster, Thang Binh District, Quang Nam Province. This factory specializes in producing clothing goods for export...

Design items includes the production workshop of 9,000m2 with 1 floor and a mezzanine, a Canteen of 1,400m2, Home for experts with the area of 850m2, Pump station and under water tank, motorbike shed, rainwater drainage system, internal road, landscape.
Dinco helped the Owner get all the licenses related to the construction.

Sasaki Shoko Vietnam Factory

Project title Sasaki Shoko Vietnam Factory
Location Dien Nam – Dien Ngoc IZ, Quang Nam
Owner Sasaki Shoko Vietnam Company, Ltd.,
Completion time 19/05/2015 – 30/12/2015
Contract sum (VND) 33.403.309.687 VND
Work scope

Sasaki Shoko Vietnam (Japan) is built on the land of 2,2 ha in area at Dien Nam – Dien Ngoc Industrial zone, Dien Ban District, Quang Nam Province. This factory specializes in producing Chochin nets and other kinds of net for aquaculture,…

The project consists of 03 workshops with the area of more than 10.000m2, motorbike shed, fence, drainage system, internal road, landscape...
Dinco helped the Owner to get all the related kinds of license such as Construction License, Firefighting Certificate, Environment Commitment Certificate.

 YVL Factory

 

Project title YVL Factory
Location Hoa Cam IZ, Cam Le Dist., Da Nang City
Owner Yonezawa Vietnam 
Completion time 03/11/2015 – 30/4/2016
Contract sum (VND) 12.686.376.000 VND
Work scope

Yonezawa Vietnam, which belongs to Fujikura Corporation – Japan, is built on the land of 2 ha in area at Hoa Cam Industrial Zone – Da Nang city. This factory specializes in producing electric wires for autos.


Continuing with phase 1,2,3 which had been completed, DINCO was awarded to construct the expansion workshop with the area of 5400m2 and ancillary facilities, including rainwater drainage system, external electricity system, internal road and landscape.

Radial Truck Tyre Manufacture Factory

Project title Radial Truck Tyre Manufacture Factory
Location Lot G, Lien Chieu IZ, Danang City
Owner Danang Rubber JSC - DRC
Completion time 04/2011 - 09/2012
Contract sum (VND)   USD 11,382,516.35 (executed by Dinco) / USD 18,027,847 (joint-venture sum)
Work scope

Radial Truck Tyre Manufacture Factory whose capacity is 600.000 tyres/year of DRC is built  on a land of 11ha in area at  Lien Chieu IZ, Danang City. The Design Consultancy of this project is CECO-MESNAC joint-venture.

DINCO is the Main Contractor for this project and executes all items: mixing workshop 29.664m2, Radial tyre workshop 61.063 m2, office 2.800m2, dynamic trench 396,8m2, height of 8,3m, vulcanization ditch 447m long x 15,3m wide x 5,7m deep, these items are RC structures.

Ancillary works include: internal roads, rainwater drainage system, canteen, water tank, fences and gates, landscape.

Being trusted by the Owner, DINCO is again selected as Main Contractor for the Second Package: Relocation of DRC’s Factory (9/2012-9/2013) whose contract sum is  USD 8,306,126 of which Dinco makes up 55% which is equal to 96,000,000,000 VND. Main RC structural items include: dynamic workshop 1.080m2, bias workshop 23.300m2, office 1.182m2, specialized tyre workshop 2.500m2, tube workshop 4.000m2, waste material location workshop 1.200m2; and some ancillary works.

Garment Equipment Manufacture factory - Groz-Beckert Viet Nam

 

 

 

 

 

 

Project title Garment Equipment Manufacture Factory
Location Dai An IZ, Ai Nghia Town, Quang Nam Province
Owner Groz-Beckert Vietnam Ltd., Co. (GBV)
Completion time 08/2008 - 04/2010
Contract sum 
USD 1,022,871 (leveling) + USD 9,264,000 (Factory)
Work scope

Garment Equipment Manufacture Factory, which belongs to Groz-Beckert (Germany), is built on a land of 12 ha in area at Dai An IZ, Ai Nghia Town, Quang Nam Province. This factory specializes in producing precise equipment for textile industry.

Base on existing designs of the Owner, DINCO is assigned to re-design and construct the whole project which includes main RC structural items as follows: production building 22.694 m2– 2 main floors and 1 mezzanine, canteen 1.515m2, storm-water tank 1.250m2. Ancillary items: internal roads, rain water collection system for production purposes, lighting system, wastewater collection system and wastewater treatment area to re-use for irrigating purposes, parking area and landscape.

This factory is built according to stringent standards of Germany, especially the finishing standards which is much higher than that of 5-star hotels. The Defect Liability Period of this project is 5 years, which is also much longer than the DLP of normal projects. Therefore, after the period of working with GBV’s staff and experts, Dinco’s employees and Managers learnt a lot and enriched their knowledge.


TCIE Vietnam Auto Plant

Project title TCIE Vietnam Auto Plant
Location Hoa Khanh Extension IZ, Danang City
Owner TCIE Vietnam Pte., Ltd
Completion time 06/2011 - 12/2012
Contract sum USD 5,612,494
Work scope

TCIE Vietnam Auto Plant, which belongs to Tan Chong Industrial Equipment – Malaysia, is built on a land of 13 ha in area at Hoa Khanh Extension IZ, Danang City. This Plant specializes in assembling the famous Auto of Japan – Nissan.

Base on basic designs of the Owner, DINCO carried out the re-design and construction of the whole project which includes: office 2.400m2, warehouse 3.200m2, canteen 1.200m2, body shop 6.790m2, paint and assembly shop 15.189m2, test track 10.162m2 - 500m long, parking area, water and electricity system, fire fighting and prevention system, internal road, wastewater collection and treatment system, underground trench and water collection ditch of painting system, rainwater drainage system, fences and gates, landscape.


Toothbrush Manufacturing Facility (Phase 2 )


 

 

 

 

 

 

Project title Toothbrush Manufacturing Facility (Phase 2 )
Location My Phuoc 3 IZ, Binh Duong Province
Owner Colgate Palmolive Vietnam Ltd., Co.
Completion time 11/2010 - 06/2011
Contract sum 
USD 1,717,861.13  / USD 421,300 /  USD 520,952.38
Work scope

Toothbrush Manufacturing Facility (Phase 2) is built on a land of 20ha in area following the success of Phase 1 of 1 year before. The Colgate Palmolive Factory of Phase 1 is the first factory in Vietnam to achieve Silver Certification for the US Green Building Council’s Leadership in Energy and Environmental Design or LEED Silver certification.  .

DINCO is the Main Contractor for this Phase 2 which includes Civil Work and M&E work. Thanks to the great efforts of all Dinco’s Managers and employees to fully comply with LEED standards, Dinco is highly appreciated by the Owner in completing the Facility successfully and helping the Owner achieve the LEED Gold Certification.


Daiwa Fishing Rod Factory (Phases 1&2)

 

Project title Daiwa Fishing Rod Factory (Phases 1&2)
Location Hoa Khanh IZ, Danang City
Owner Daiwa Vietnam Ltd., Co.
Completion time Phase 1: 7 months. Phase 2: 9 months
Contract sum  
USD 2,377,435 (Phase 1). USD 3,121,000 (Phase 2)
Work scope

This project marks the first time Dinco works with Japanese Partner. In this project, Dinco helps the Owner to re-design the structure to reduce cost. Although this is the first time to work with Japanese partner, Dinco receives high appreciation from the Owner for completing the project sooner than scheduled and fully complying with stringent requirements of the Owner.

Phase 1 of the project is named as Daiwa 06A Factory with the following items: workshop 7.300m2 and office 2.800m2 in RC structures, internal road, rain water drainage system, guard house, fences and gates and landscape. In Aug 2006, Daiwa 06A Factory was ranked as the strongest factory by the Architecture & Life Magazine because it was not damaged by the Xangsane typhoon whereas other neighboring factories were nearly damaged seriously.

Following the success of Phase 1, Dinco continues to be selected as Contractor for the Phase 2, which is named as Daiwa 08B-C Factory. This Phase 2 factory doubles the size of factory of phase 1, equivalent 18,000m2 and ancillary works, its completion time is 9 months. 


CCI Vietnam Electronic Component Factory

 

Project title CCI Vietnam Electronic Component Factory
Location Bac Chu Lai IZ, Quang Nam Province
Owner CCI Vietnam Ltd., Co.
Completion time 3/2007- 09/2007
Contract sum  USD 1,870,000  USD
Work scope

CCI Vietnam Factory, is built on a land of 20 ha in area.

DINCO is the General Contractor of this project, including designing and constructing the whole factory. Base on the basic designs of the Consultancy Chan Kok Way – Singapore, Dinco re-designed and reduce project’s cost from 2.500.000 USD down to 1.870.000 USD by locating the office in the mezzanine of the factory without its function and capacity. Scope of work is: office 1,500m2, workshop 2,500m2, canteen 700m2, dormitory 550m2, water and electricity system, fire fighting and prevention system, internal road, rain water drainage system, fences and gates, landscape, parking area for motorbikes and cars.

Being trusted by the Owner, Dinco continues to be selected as General Contractor for other supplementary works: extend the canteen within 4 months; underground water tank, septic tank and toilets within 3 months.

Yonezawa Electric Wire Factory - Phases 1, 2 & 3

 

Project title Yonezawa Electric Wire Factory - Phases 1, 2 & 3
Location Hoa Cam IZ, Danang City
Owner Yonezawa Vietnam Ltd., Co.
Completion time 10 months / 6 months / 5 months
Contract sum 
USD 1,717,861.13  / USD 421,300 /  USD 520,952.38
Work scope

Yonezawa Electric Wire Factory, which belongs to Fujikura – Japan, is built on a land of 40.000m2.

DINCO is the Contractor for all 3 phases of this project. Phase 1 is executed within 10 months including such items as: workshop 10.500m2, and ancillary works, temporary works, external works.

Phase 2 consists of similar items, in which the workshop is 2.900m2 in area, its completion time is 6 months.

At present, Dinco is continuing the Phase 3 whose main item is building a new workshop 54x54m and related works. The completion time is from Mar 2013 to Jul 2013.

Chu Lai Float Glass Factory

 

Project title Chu Lai Float Glass Factory
Location Bac Chu Lai IZ, Quang Nam Province
Owner Chu Lai Float Glass JSC - TKV
Completion time 2/2008 - 05/2009
Contract sum 
USD 4,601,214
Work scope

Chu Lai Float Glass Factory, which belongs to INDEVCO – Viet Nam, is built on a land of 50.000m2. This factory specializes in producing construction glass and other types of glass.

This is a very complicated model of factory where Dinco executes the 2 most difficult items which are considered as the heart of the project, they are: processing and mixing workshops in RC structures whose distance from floor to roof is 24m. Other items: office, internal road, rain water drainage system, fences and gates, landscape.

Sakai Vietnam Chemical Factory

Project title Sakai Vietnam Chemical Factory
Location My Phuoc 3 IZ, Binh Duong Province
Owner Sakai Vietnam Chemical Ltd., Co.
Completion time 8/2008 - 5/2009
Contract sum 
USD 2,441,274
Work scope

Sakai Vietnam Chemical Factory of Sakai Group – Japan is 10,812m2, located at My Phuoc 3 IZ, Binh Duong Province. Dinco executes the following items of work: dry workshop (foundation), wet workshop (foundation), tank yard and wastewater treatment area.


 

YVL Factory